View Project Portfolio

What Our Clients Are Saying

The thorough and timely manner in which you handled the problem here on Cascade was much appreciated. Without exception, your people were thoughtful, considerate, and professional. I felt you and your company handled my problem efficiently and carefully, and that we were in good hands.

Sheryl A. Fuller

Drilling & Probing

Peace Health/Sacred Heart Medical Center RiverBend

Client

Peace Health/Sacred Heart Medical Center
Springfield, Oregon

Project Type

Spill Response Investigations

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

The Sacred Heart Medical Center at RiverBend complex is located on 181 acres along the McKenzie River in Springfield, Oregon, and opened in August 2008. Two (2) underground storage tanks (USTs), each having a nominal capacity of 40,000 gallons, were installed at the facility for storage of diesel fuel associated with an emergency electrical power supply system for the facility.

RI/FS: Former Automotive Repair Facility/Oregon Garden Property

Client

Former Automotive Repair Facility/Oregon Garden Property
Marion County, Oregon

Project Type

Hazardous Waste Investigations
Remedial Investigation/Feasibility Study (RI/FS)

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

The subject property is currently a vacant parcel that was acquired by the City of Silverton as part of the Oregon Garden site. The subject site was formerly utilized for vehicle repair and fuel storage using underground storage tanks (USTs). Previous investigations included Phase I and Phase II Environmental Site Assessments (ESAs). Project tasks included: UST decommissioning activities, petroleum contaminated soil (PCS) cleanup, and completion of a Remedial Investigation and Feasibility Study (RI/FS) including a human health and ecological risk assessment.

Oregon State Highway 99 Jet Fuel Spill

Client

Oregon DOT
Harrisburg, Oregon

Project Type

Spill Response Investigations

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

On August 16, 2004, a truck and tanker trailer rounding a curve on Highway 99E ran onto the graveled shoulder and edge of an open stormwater drainage ditch. The tanker trailer struck a utility pole adjacent to the stormwater ditch, rolled onto its side, and came to rest on the west side of the highway near the entrance to a recreational motor vehicle assembly plant and retail automotive service station.

Oregon State Highway 38 Gasoline Spill; Umpqua River

Client

Oregon DOT
Douglas County, Oregon

Project Type

Spill Response Investigations

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

On September 8, 2003, a fixed frame tanker and tanker trailer crashed on Oregon State Highway 38 near mile marker 19 within the community of Greenacres, Oregon. During the crash the tanker trailer overturned, ruptured, and spilled approximately 6,200 gallons of gasoline. Subsequent accidental ignition of the spill resulted in a fire that killed several trees, spread into the lawn of an adjacent residence, and further damaged the roadway.

Oregon State Highway 22; Detroit Reservoir

Client

Oregon DOT
Marion County, Oregon

Project Type

Spill Response Investigations

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

Operating under the Unified Command System (UCS), which included representatives from the US Environmental Protection Agency (EPA), Oregon Department of Environmental Quality (DEQ), US Forest Service, Oregon Department of Transportation (ODOT), Army Corps of Engineers, and the City of Salem, BB&A Environmental provided the technical lead in the environmental assessment and mitigation of an 11,000-gallon gasoline spill which occurred along Highway 22 adjacent to Detroit Reservoir east of Salem, Oregon.

ESA: Large Trucking Facility

Client

Large Trucking Facility
Portland, Oregon

Project Type

Phase I and II Environmental Site Assessments (ESA)

Project Services

Consulting & Engineering
Drilling & Probing

Project Description

The nature of the business at the project site required storage of bulk motor oil, hydraulic oil, waste oil, antifreeze, batteries, and smaller quantities of hazardous materials. The subject property historically operated numerous underground storage tanks (USTs), production water wells, underground injection control (UIC) structures, and cesspools. Prior to operation as a trucking facility, the subject property was used to manufacture pipe and finished materials were shipped via an adjacent railroad spur.

ESA: Peace Health/Sacred Heart Medical Center University Campus

Client

Peace Health/Sacred Heart Medical Center
Eugene, Oregon

Project Type

Phase I and II Environmental Site Assessments (ESA)

Project Services

Consulting & Engineering
Drilling & Probing

Project Description

BB&A Environmental was retained by Sacred Heart Medical Center to perform a Phase I Environmental Site Assessment (ESA) of the hospital campus which includes commercial properties in a multi-block area located in Eugene, Oregon.

ESA: Industrial Printing Facility

Client

Industrial Printing Facility
Clackamas County, Oregon

Project Type

Phase I and II Environmental Site Assessments (ESA)

Project Services

Consulting & Engineering
Drilling & Probing

Project Description

BB&A Environmental conducted a Phase I Environmental Site Assessment (ESA) to assess current and future environmental liability associated with the subject property due to former on-site operations and/or potential environmental trespass from nearby light industrial and manufacturing facilities.

Port of Portland Leased Facility

Client

Portland International Airport
Portland, Oregon

Project Type

Remediation System Design and Engineering

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

Project management included design and installation of chemical oxidation (CO) and soil vapor extraction (SVE) systems to reduce soil and groundwater contaminants to concentrations below risk-based concentrations (RBCs) for applicable receptors and exposure pathways. The project is ongoing and has been implemented in two (2) phases. Phase I targeted remediation of gasoline-range total petroleum hydrocarbons (TPH) in soil and groundwater beneath, and adjacent to, the footprint of the on-site building.

Dual Phase Liquid/Vapor Extraction System Retail Service Station Facility

Client

Retail Service Station
Lane County, Oregon

Project Type

Remediation System Design and Engineering

Project Services

Consulting & Engineering
Drilling & Probing
Field & Remediation

Project Description

The project site is a retail service station facility located in Veneta, Oregon. Below-ground releases of gasoline at the subject property dating back to 1979 resulted in on-site and off-site soil and groundwater impact beneath a broad area.

In 1991, two (2) independently operated groundwater pump-and-treat systems were installed to process groundwater impacted by the release and control plume migration.

Syndicate content